← All work

LuxeWear Logistics

Zero-downtime migration of a high-traffic fashion portal during peak sales.

LuxeWear Logistics interface

The challenge

A Black Friday campaign was three weeks out and the incumbent host could not handle more than 400 concurrent checkouts.

What we built

We staged a parallel LiteSpeed cluster, replicated the catalogue with Galera, and cut DNS over during a 90-second maintenance window.

0 min
Downtime
0.7s
Page load
3,100/hr
Peak checkouts

Ready to Level Up?

Get expert advice for your specific project needs. Our technicians are standing by on WhatsApp.

Average response time: < 5 minutes