← All work
LuxeWear Logistics
Zero-downtime migration of a high-traffic fashion portal during peak sales.

The challenge
A Black Friday campaign was three weeks out and the incumbent host could not handle more than 400 concurrent checkouts.
What we built
We staged a parallel LiteSpeed cluster, replicated the catalogue with Galera, and cut DNS over during a 90-second maintenance window.
0 min
Downtime
0.7s
Page load
3,100/hr
Peak checkouts
Ready to Level Up?
Get expert advice for your specific project needs. Our technicians are standing by on WhatsApp.
Average response time: < 5 minutes